Electrification WORKS OF ZONE Internal Electrification 100% Completed Grid Station (21 MW)In Progress 55% CompletedTemporary Supply of 2.5 MW (up-to 5MW) by GEPCO has been energized. For Construction of 21 MW Grid Station, with support of EDF & PSIC the construction work has been started by GEPCO. Grid Station -Transformer Yard Poles – Transmission Line HT Transmission Lines Internal LT Transmission Lines Internal LT Transmission Lines Grid Station – Control Room